My Kitchen Remodeling
This kitchen remodeling project came about as my kitchen was old and tired having been installed some 25 years ago. I was contemplating the work needed when my daughter decided to have her kitchen remodelled and offered me the chance to re-use her kitchen units, which were only 6 years old and in very good condition. I jumped at the chance to have my kitchen remodeling done reasonably cheaply. So I hired a box van one weekend and collected her kitchen units. The work of kitchen remodeling progressed over the next month or so. • Empty existing kitchen units • Remove all doors and drawers (Posidriv 2 pt screwdriver) • Remove the wall cupboards (Stepladder, large flat bladed screwdriver HSS drill bit with power drill to drill out stubborn screws, wear safety goggles). • The kitchen floor was uneven and needed levelling, as I don’t have the tools or the skill necessary to do such work it was contracted out to a specialist floor layer (Get 3 quotes before allocating the work) • The day before the floor layer was due to arrive the kitchen units and worktops were removed. The kitchen sink was also removed. To do this it is necessary to turn off the hot and cold water supplies at the outlet to the cistern, and using the appropriate tools disconnect the taps (Tap spanner or 2 large adjustable spanners, if flexible fitting have been used to connect the taps to the pipes). The pipes then need to be fitted with 15mm stop end compression fittings (Plumber’s merchant, B & Q or similar). The water can then be turned on at the cistern. • Once the floor had been levelled the central heating boiler and hot water cylinder were replaced. An Accredited Contractor (A legal requirement in the UK) did this. The sink unit could then be replaced on a temporary basis. • Now for the kitchen lighting, I chose 5 down-lighters and a central array of 3 spot lights (B & Q) on 2 circuits, controlled by double dimmer switches. The existing light fittings were removed (Isolate at Fuse-board), holes were cut for the down-lighters (Stepladder, hole cutter, power drill, safety goggles and dust mask). • Ceiling painted with 2 coats of Dulux Colourflex rich matt “Timeless” (stepladder, paint tray and paint roller). • Electrician installs cables and kitchen lighting. ![]() • Internal doors, doorframes and skirting boards were painted with Dulux non drip gloss “cornfield (fine sandpaper , 2 inch & ½ inch paintbrushes, paintbrush cleaner) • Imperfections in walls filled with “Polyfiller” fine surface filler, then areas of wall not covered by units or tiles painted with 2 coats of Polycell base coat emulsion followed by 2 coats of Dulux “straw” matt emulsion (Allowing drying times between each coat). • Tile floor (330mm floor tiles, large tile cutter, waterproof adhesive, spreader). • Tile end walls (Wall tiles, adhesive, spreader, spirit level, edging strip) • Install wall units (Masonry bit, power drill, wallplugs stepladder, long spirit level, 2nd person, safety goggles). • Install floor units (Spirit level, spanner to adjust feet, screws and screwdriver) • Fit doors and shelves to kitchen units (Screwdriver) • Modify and fit worktops (Chisels, mallet, 22 inch saw, work-bench, screws and screwdriver). • Tile walls above worktops and behind cooker. • Replace washing machine • Replace cooker • Breathe a sigh of relief at completing your kitchen remodeling project, and vow to never take on such a large project again. • Next time pay some-one to do your kitchen remodeling for you. |